{"product_id":"ev-ready-renovation-new-build-assessment","title":"EV-Ready Renovation \u0026 New Build Assessment","description":"\u003cp\u003ePlan EV charging before walls, ceilings, driveways or electrical plans are finalised, helping reduce avoidable rework and cost later.\u003c\/p\u003e\n\u003cp\u003e\u003cstrong\u003ePrepare for EV charging before construction or renovation work is completed.\u003c\/strong\u003e\u003c\/p\u003e\n\u003cp\u003eYou do not always need to install the charger immediately. Planning the charger location, conduit pathway, cable route and switchboard allowance early can make future installation cleaner, easier and more practical.\u003c\/p\u003e\n\u003cp\u003eGridPilot’s EV-Ready Assessment is designed for homeowners, builders and renovation teams planning garages, carports, driveways, switchboard work, solar, batteries or new-build projects.\u003c\/p\u003e\n\u003ch3\u003eWhat We Review\u003c\/h3\u003e\n\u003cul\u003e\n\u003cli\u003eCurrent plans and expected construction stage\u003c\/li\u003e\n\u003cli\u003ePossible Future charger location and parking position\u003c\/li\u003e\n\u003cli\u003ePreliminary conduit and cable-route considerations\u003c\/li\u003e\n\u003cli\u003eSwitchboard location and possible allowance for future EV charging\u003c\/li\u003e\n\u003cli\u003eIndoor or outdoor charger placement consideration\u003c\/li\u003e\n\u003cli\u003eInformation to discuss with the builder and licensed electrician\u003c\/li\u003e\n\u003cli\u003eSolar, battery, smart charging and second-EV plans\u003c\/li\u003e\n\u003cli\u003eWhether to install now or prepare infrastructure for later\u003c\/li\u003e\n\u003c\/ul\u003e\n\u003ch3\u003eWhat You Receive\u003c\/h3\u003e\n\u003cul\u003e\n\u003cli\u003eReview of the visible site and available plans\u003c\/li\u003e\n\u003cli\u003ePreliminary recommended future charger location\u003c\/li\u003e\n\u003cli\u003ePreliminary conduit and cable-route considerations\u003c\/li\u003e\n\u003cli\u003eEV charging considerations for professional review as part of the switchboard and wider project scope\u003c\/li\u003e\n\u003cli\u003ePreliminary install-now versus prepare-for-later pathway\u003c\/li\u003e\n\u003cli\u003eA concise written EV-ready summary for discussion with the builder and licensed electrician\u003c\/li\u003e\n\u003c\/ul\u003e\n\u003ch3\u003eImportant Notes\u003c\/h3\u003e\n\u003cul\u003e\n\u003cli\u003ePrice covers one standard residential renovation or new-build project within GridPilot’s standard Auckland service area.\u003c\/li\u003e\n\u003cli\u003ePlans should be supplied before the assessment where available.\u003c\/li\u003e\n\u003cli\u003eThe assessment provides preliminary planning guidance based on visible site conditions, available plans and information provided at the time of assessment.\u003c\/li\u003e\n\u003cli\u003eIt is not an electrical design, construction drawing, approval to carry out work or confirmation of final installation feasibility.\u003c\/li\u003e\n\u003cli\u003eFinal measurements, cable sizing, circuit design, electrical capacity, protection requirements, installation methods, compliance decisions and prescribed electrical work must be independently confirmed and completed by suitably qualified and licensed professionals.\u003c\/li\u003e\n\u003cli\u003eMajor developments, apartment projects and multi-dwelling sites require a Commercial Site Assessment and custom scope.\u003c\/li\u003e\n\u003c\/ul\u003e\n\u003cp\u003e\u003cem\u003eAny electrical installation is separately assessed, quoted, contracted, invoiced, performed, tested and certified by an independent licensed electrical contractor engaged directly by the customer. GridPilot does not supply or invoice the electrical installation service.\u003c\/em\u003e\u003c\/p\u003e\n\u003ch3\u003eBooking Information\u003c\/h3\u003e\n\u003cul\u003e\n\u003cli\u003eAllow approximately 60–90 minutes for the assessment and plan discussion.\u003c\/li\u003e\n\u003cli\u003eBook before walls, ceilings, driveways or landscaping are closed or completed wherever possible.\u003c\/li\u003e\n\u003cli\u003eFull payment of NZ$199 incl. GST is required before the assessment.\u003c\/li\u003e\n\u003c\/ul\u003e\n\u003ch3\u003eGridPilot’s Role and Next-Step\u003c\/h3\u003e\n\u003cp\u003eGridPilot provides an early planning summary to support discussion with the customer’s builder and licensed electrical contractor. GridPilot may separately quote eligible charger equipment, but does not supply or invoice electrical installation services. Final construction and electrical decisions remain with the appropriately qualified professionals responsible for the project.\u003c\/p\u003e\n\u003cp\u003e\u003c!-- notionvc: 7170a878-c625-44a6-97ef-33ba9fadd28f --\u003e\u003c\/p\u003e","brand":"GridPilot","offers":[{"title":"Default Title","offer_id":64515689218417,"sku":null,"price":199.0,"currency_code":"NZD","in_stock":true}],"thumbnail_url":"\/\/cdn.shopify.com\/s\/files\/1\/1034\/0161\/9825\/files\/ev-ready-assessment.png?v=1788469569","url":"https:\/\/gridpilot.co.nz\/products\/ev-ready-renovation-new-build-assessment","provider":"GridPilot EV Solutions","version":"1.0","type":"link"}